Projects

...
Projects

Our Creative Projects

...
Revamping

TANK 102 REVAMPING

  • Client: GAPCO TANZANIA LIMITED
  • Duration: 7 MONTHS
  • Budget: 1.3B
  • Location: TOTAL TERMINAL DSM
...
Construction

PROPOSED CONSTRUCTION OF CNG AND CONVERSION STATION

  • Client: Taqa dalbit tanzania ltd
  • Duration: 3 months
  • Budget: 730m
  • Location: mbezi beach jogoo
...
Construction

CONSTRUCTION OF CNG DAUGHTER STATION

  • Client: puma energy
  • Duration: 3 months
  • Budget: 1B
  • Location: Alliance one morogoro
...
Construction

CONSTRUCTION OF CNG STATION

  • Client: puma energy
  • Duration: 3 months
  • Budget: 575m
  • Location: mbezi beach tank bovu
...
Revamping

TANK 309 REVAMPING

  • Client: Total energies Tanzania
  • Duration: 4 months
  • Budget: 490m
  • Location: total terminal Dsm
...
Civil Engineering

GABION INSTALLATION

...
Mechanical Engineering

FIRE FIGHTING INSTALLATION

...
Civil Engineering

PETROL STATION CONSTRUCTION

...
Mechanical Engineering

CALIBRATION WORKS

...
Civil Engineering

INTERIOR DESIGN

...
Civil and Mechanical

BRANDING AND RENOVATION

...